Bhopal: Heavy Rain Inundates Low-Lying Areas, Disrupts Daily Life; 2.5 Inches Recorded In 24 Hours

Bhopal: Heavy Rain Inundates Low-Lying Areas, Disrupts Daily Life; 2.5 Inches Recorded In 24 Hours

Alert sounded: NDRF office wall collapses; Bhumika residency boundary wall in Damkheda develops crack due to soil erosion  from Kaliyasot River. Eleven gates of Kaliyasot Dam, two of Bhadbhada opened on Sunday.

Staff ReporterUpdated: Monday, August 05, 2024, 10:47 AM IST
article-image
Bhopal: Heavy Rain Inundates Low-Lying Areas, Disrupts Daily Life; 2.5 Inches Recorded In 24 Hours | FP Photo

Bhopal (Madhya Pradesh): The wall of the National Disaster Response Force’s (NDRF) office at Idgah Hills collapsed on Sunday due to the relentless rain, while heavy soil erosion from the Kaliyasot River caused cracks in the boundary wall of Bhumika Residency in Damkheda, of the Kolar satellite township.

Although no casualties were reported in either incident, the local administration has issued an alert for residents of Bhumika Residency and Sarmadha, both adjacent to the Kaliyasot River bank. Eleven gates of the Kaliyasot Dam and two gates of the Bhadbhada Dam were opened on Sunday to release excess water.

Meanwhile, people continued to struggle with heavy water-logging as the city recorded 2.5 inch (64.3mm) rainfall in the last 24 hours, said the weather department.  The torrential downpour caused water-logging in many colonies, including Sundar Nagar, Oriya Basti, Shankar Nagar, Gupta Colony, Sindhi Colony, Nadra Bus Stand, and Alpana Tiraha.

FP Photo

The Bhopal Municipal Corporation (BMC) has deployed teams in all 85 wards to drain out the accumulated rainwater. The overflowing drain on the road leading to Kabadkhana (categorized market) posed problems for shopkeepers. The road from the bus stand to the railway station remains heavily water-logged. A brief spell of heavy rain led to flooding in Shri Ram Mandir, located in Ward 18 on Chhola Road.  

"21 Million Cubic Feet (MCFT) of water is being released every hour. Since the water released from Bhadbhada Dam reaches Kaliyasot Dam, the gates of Kaliyasot Dam were opened at 9 am."

-Udit Garg, Suptd engineer, BMC  

"Incessant heavy downpour and strong currents led to soil erosion from the Kaliyasot River, causing the boundary wall of Bhumika Residency to develop cracks. JCB machines have been deployed to fill the ditch, and residents have been put on alert."

-Ravishankar Rai, SDM    

RECENT STORIES

Ananta Chaturdashi 2024: Jabalpur Makes Separate 'Kund' On Narmada Ghat For Ganapati Visarjan

Ananta Chaturdashi 2024: Jabalpur Makes Separate 'Kund' On Narmada Ghat For Ganapati Visarjan

MP Updates: Speeding E-Rickshaw Rams Into Bystanders, Video Surfaces; Clash Erupts At Jabalpur...

MP Updates: Speeding E-Rickshaw Rams Into Bystanders, Video Surfaces; Clash Erupts At Jabalpur...

President Droupadi Murmu To Visit Ujjain's Mahakaleshwar Temple; Tight Security Arrangements In...

President Droupadi Murmu To Visit Ujjain's Mahakaleshwar Temple; Tight Security Arrangements In...

MP Updates: Jabalpur Artist Honours PM Modi With Intricate Oil Painting; Indore Wins Best Local...

MP Updates: Jabalpur Artist Honours PM Modi With Intricate Oil Painting; Indore Wins Best Local...

Retired IPS Vijay Yadav Sworn In As MP's Chief Information Commissioner; Three Others Appointed

Retired IPS Vijay Yadav Sworn In As MP's Chief Information Commissioner; Three Others Appointed