Water enters 6th unit of Kunda power house, generation stopped

Water enters 6th unit of Kunda power house, generation stopped

BureauUpdated: Saturday, June 01, 2019, 11:55 AM IST
article-image

Udhagamandalam(TN): A sudden gush of water in a pipeline from Porthi dam to the sixth unit of Kunda Hydel power project near here led to stoppage of power generation since last night, official sources said.

They said a block in the pipeline resulted in a manhole blowing off and water rushing to a lower level, where the power house is situated.

Water entered the rooms of the three-storeyed powerhouse, where rotors, circuit breakers and PCBs were kept, following which generation was stopped since last night.

The unit generates 30 MW and is the main source of electricity for Nilgiris district.

Efforts to pump out the water started this morning and is likely to to go till late in the night, after which power generation is expected to resume,the sources said.

RECENT STORIES

Uttar Pradesh News: Varanasi To Glow With 25 Lakh Diyas On Dev Deepawali On November 5

Uttar Pradesh News: Varanasi To Glow With 25 Lakh Diyas On Dev Deepawali On November 5

Samajwadi Party Chief Akhilesh Yadav Hits Back At CM Yogi’s ‘Three Monkeys’ Remark During...

Samajwadi Party Chief Akhilesh Yadav Hits Back At CM Yogi’s ‘Three Monkeys’ Remark During...

PNB Scam Accused Mehul Choksi Moves Belgian Supreme Court Over Extradition

PNB Scam Accused Mehul Choksi Moves Belgian Supreme Court Over Extradition

Karnataka News: 15 Injured, Including 5 Children, After Rabid Dog Attack In Ilkal

Karnataka News: 15 Injured, Including 5 Children, After Rabid Dog Attack In Ilkal

DGCA Proposes 48-Hour Free Cancellation, Revision In Air Ticket Refund Rules

DGCA Proposes 48-Hour Free Cancellation, Revision In Air Ticket Refund Rules