Central Railway to operate mega block on Sunday to carry out maintenance works

Central Railway to operate mega block on Sunday to carry out maintenance works

"Passengers are requested to bear with the Railway Administration for the inconvenience caused," the CR said.

Staff ReporterUpdated: Thursday, April 13, 2023, 08:26 PM IST
article-image
Central Railway to operate mega block on Sunday for maintenance works | PTI

Central Railway, Mumbai Division will operate a mega block on its suburban sections carrying out various engineering and maintenance works on April 16.

The block will be operated as follows:

Matunga-Mulund Up and Down fast lines from 11.05 am to 3.55 pm

Down fast line services leaving Chhatrapati Shivaji Maharaj Terminus Mumbai from 10.25 am to 3.35 pm will be diverted on Down slow line between Matunga and Mulund stations halting as per their respective scheduled halts and fast trains beyond Thane will be re-diverted on Down fast line, and will arrive destination 15 minutes behind schedule.

Up fast line services leaving Thane from 10.50 am to 3.46 pm will be diverted on Up slow line between Mulund and Matunga halting as per their scheduled halts and will be re-diverted on Up fast line and will arrive destination 15 minutes behind schedule.

Chhatrapati Shivaji Maharaj Terminus-Chunabhatti / Bandra Down harbour line from 11.40 am to 4.40 pm & Chunabhatti / Bandra-Chhatrapati Shivaji Maharaj Terminus Up harbour line from 11.10 am to 4.10 pm

Chhatrapati Shivaji Maharaj Terminus-Chunabhatti / Bandra Down harbour line from 11.40 am to 4.40 pm & Chunabhatti / Bandra-Chhatrapati Shivaji Maharaj Terminus Up harbour line from 11.10 am to 4.10 pm

Down Harbour line services to Vashi /Belapur/Panvel leaving Chhatrapati Shivaji Maharaj Terminus Mumbai/ Vadala Road from 11.16 am to 4.47 pm and Down Harbour line services to Bandra/Goregaon leaving Chhatrapati Shivaji Maharaj Terminus Mumbai from 10.48 am to 4.43 pm will remain suspended.

Up Harbour line services for Chhatrapati Shivaji Maharaj Terminus Mumbai leaving Panvel/Belapur/Vashi from 9.53 am to 3.20 pm and Up Harbour line services for Chhatrapati Shivaji Maharaj Terminus Mumbai leaving Goregaon/ Bandra from 10.45 am to 5.13 pm will remain suspended.

However, special services will run between Panvel and Kurla (Platform No.8) at about 20 minutes frequency during the block period.

Harbour line passengers are permitted to travel via Main Line and Western Railway from 10.00 am to 6.00 pm during block period.

"These maintenance mega blocks are essential for infrastructure upkeep and safety. Passengers are requested to bear with the Railway Administration for the inconvenience caused," the Central Railway said.

RECENT STORIES

Mumbai News: GRP Faces Scrutiny Over Flouted Regulations For Billboards Near Ghatkopar Petrol Pump

Mumbai News: GRP Faces Scrutiny Over Flouted Regulations For Billboards Near Ghatkopar Petrol Pump

‘Shifting Responsibility’, Panel Asks BMC, Police To Hold Inquiry

‘Shifting Responsibility’, Panel Asks BMC, Police To Hold Inquiry

Mumbai: Siddhivinayak Ground Gets New Trees To Compensate For Those Cut For Metro Station

Mumbai: Siddhivinayak Ground Gets New Trees To Compensate For Those Cut For Metro Station

Mumbai: BMC Anounces 16 Hours Of Water Cut On May 22-23 In City's K East, K West, and P South Wards;...

Mumbai: BMC Anounces 16 Hours Of Water Cut On May 22-23 In City's K East, K West, and P South Wards;...

Mumbai: Mihir Kotecha Writes Letter To DCM Devendra Fadnavis To Reconstruct 80-Year-Old Dilapidated...

Mumbai: Mihir Kotecha Writes Letter To DCM Devendra Fadnavis To Reconstruct 80-Year-Old Dilapidated...