Bhopal (Madhya Pradesh): Bhopal Metro is scheduled to operate from 11 am to 4:30 pm starting April 3, as per the new schedule released by the Metro Corporation.
The daily trips have also been reduced from 13 to 9 daily.
This is the 3rd time in 100 days that the schedule has been changed.
The management said signal work has begun on the priority corridor between Subhash Nagar and AIIMS.
This is the first phase of an 800-crore tender covering about 30 km. Due to the absence of a complete signaling system, trains are running on only one track, resulting in a 75-minute frequency and longer waiting times for passengers.
The Orange Line’s priority corridor will be affected by this work. However, the management has not clarified how long the signaling work will continue or when normal timings will resume.
Bhopal Metro Orange Line - Midday Schedule (AIIMS ↔ Subhash Nagar)
Frequency: Every 75 minutes due to ongoing signaling work.
First Train: 11:00 AM → reaches RKMP at 11:11 AM → arrives at Subhash Nagar at 11:25 AM
Second Train: 12:15 PM → Subhash Nagar arrival: 12:40 PM
Third Train: 1:30 PM → Subhash Nagar arrival: 1:55 PM
Fourth Train: 2:45 PM → Subhash Nagar arrival: 3:10 PM
Final Train: 4:00 PM → Subhash Nagar arrival: 4:25 PM
From Subhash Nagar to AIIMS
First Train: 11:40 AM → passes DB Mall at 11:47 AM → arrives at AIIMS at 12:05 PM
Second Train: 12:55 PM → AIIMS arrival: 1:20 PM
Third Train: 2:10 PM → AIIMS arrival: 2:35 PM
Final Train: 3:25 PM → AIIMS arrival: 3:50 PM
The schedule ensures midday travel is possible for office-goers, students, and shoppers.
Major stops like DB Mall, DRM Office, and MP Nagar are covered.
Trains are operating on one track only, so commuters should plan for longer waiting times.
This schedule is effective from 11:00 AM to 4:30 PM due to ongoing signal system work.