Special Traffic and Power Blocks for launching of 4 Steel nos for the proposed construction of the Road Over Bridge on the Lonavala-Malavali section
Central Railway will operate Special Traffic and Power Blocks for launching of 4 Steel nos for the proposed construction of Road Over Bridge on Lonavala-Malavali section in lieu of Level Crossing gate no 32 at Kms 128/16-17 on 06.04.2025, 07.04.2025 & 08.04.2025.
These blocks on UP & Down Lines between Malavali and Lonavala will be operated from 06.04.2025 to 08.04.2025 as per details below:
Repercussions due to the Block:
Block 1 on 06.04.2025 (Sunday) from 13.05 hours to 16.05 hours

Regulation of Mail / Express trains
22159 CSMT-Chennai express will be regulated at Lonavala till 16.05 hours
17222 LTT-Kakinada express will be regulated at Karjat till 15.20 hours
22194 Gwalior-Daund express will be regulated at Chauk for 10 minutes
Short Termination / Origination of EMU trains
99814 Pune-Lonavala EMU & 99816 Shivaji Nagar-Lonavala EMU will be short terminated at Malavali
99813 Lonavala-Pune EMU & 99815 Lonavala- Shivaji Nagar EMU will short originate from Malavali

Block 2 on 07.04.2025 (Monday) from 13.05 hours to 14.35 hours
Short Termination / Origination of EMU trains
99816 Shivaji Nagar-Lonavala EMU will be short-terminated at Malavali
99813 Lonavala-Pune EMU will short originate from Malavali
Block 3 on 08.04.2025 (Tuesday) from 13.05 hours to 15.05 hours

Short Termination / Origination of EMU trains
99816 Shivaji Nagar-Lonavala EMU will be short-terminated at Malavali
99813 Lonavala-Pune EMU will short originate from Malavali
These blocks are essential for infrastructure upkeep and safety. Passengers are requested to bear with the Railway Administration for the inconvenience caused.