Mumbai-Ahmedabad Bullet Train Project: 210-Meter Bridge Over NH-48 Completed In Gujarat

Mumbai-Ahmedabad Bullet Train Project: 210-Meter Bridge Over NH-48 Completed In Gujarat

Two PSC bridges both crossing NH-48 in Navsari district, between Surat and Bilimora Bullet Train stations, were already completed. These include bridges are 260 meters and 210 meters, respectively.

Kamal MishraUpdated: Tuesday, January 07, 2025, 08:25 PM IST
article-image

A 210 meter long PSC (Pre-stressed concrete) bridge designed to cross over National Highway-48 (Delhi-Chennai) at Vaghaldhara village near Panchlai in Valsad district in Gujarat is completed on January 2, 2025.

The bridge features 72 precast segments and spans a configuration of 40m + 65m + 65m + 40m. It was built using the Balanced Cantilever Method, which is ideal for larger spans.

Two PSC bridges both crossing NH-48 in Navsari district, between Surat and Bilimora Bullet Train stations, were already completed. These include bridges are 260 meters and 210 meters, respectively. 

The newly completed bridge near Vaghaldhara is situated between Vapi and Bilimora Bullet Train stations. Given that NH-48 is one of India’s busiest highways, construction was meticulously planned to ensure the safety of both vehicles and workers while maintaining uninterrupted traffic flow and minimizing public inconvenience.

Additional lanes were built on both sides of the highway to avoid vehicles from passing beneath suspended loads or within the one-meter shadow margin during construction. A phased traffic diversion plan, monitored continuously, was implemented to avoid any disruptions to highway traffic.

RECENT STORIES

How Can Entrepreneurs Set Up Shops Inside Mumbai Metro Stations?MMMOCL Launches Golden Opportunity

How Can Entrepreneurs Set Up Shops Inside Mumbai Metro Stations?MMMOCL Launches Golden Opportunity

Mumbai: BKC Police Book Accountant For Cheating And Embezzling ₹36 Lakh From Film Production...

Mumbai: BKC Police Book Accountant For Cheating And Embezzling ₹36 Lakh From Film Production...

BMC Reconsiders Plan To Demolish Veer Savarkar Flyover After FPJ Campaign And Citizen Protests

BMC Reconsiders Plan To Demolish Veer Savarkar Flyover After FPJ Campaign And Citizen Protests

Mumbai: Ghatkopar Tech Professional Loses Rs 35.71 Lakh To Fake Online Trading App

Mumbai: Ghatkopar Tech Professional Loses Rs 35.71 Lakh To Fake Online Trading App

Navi Mumbai: 25-Year-Old Transgender Molests Women In Mumbai Local Train , Arrested At Nerul Station

Navi Mumbai: 25-Year-Old Transgender Molests Women In Mumbai Local Train , Arrested At Nerul Station