Nashik: 12-Day Railway Block At Kasara To Affect 39 Trains From October 7
The block in the Kasara area is scheduled for October 7 and 8 from 3.35 pm to 8.35 pm, and on October 9 from 12.30 am to 5.30 am. Consequently, suburban rail services between Asangaon and Kasara will remain suspended during the block period, while several CSMT-Kasara local trains will be short-terminated at Asangaon

Nashik: 12-Day Railway Block At Kasara To Affect 39 Trains From October 7 | Representative
Nashik: Central Railway will undertake a special 12-day traffic and power block from October 7 to 18 to facilitate the construction of the Asangaon-Kasara third line and expansion of the Up yard line at Kasara. The block is expected to affect several mail and express trains running via Nashik, along with Mumbai suburban local train services.
The block in the Kasara area is scheduled for October 7 and 8 from 3.35 pm to 8.35 pm, and on October 9 from 12.30 am to 5.30 am. Consequently, suburban rail services between Asangaon and Kasara will remain suspended during the block period, while several CSMT-Kasara local trains will be short-terminated at Asangaon.
Several mail and express trains running via Nashik will also be affected. Trains including the Gorakhpur-Lokmanya Tilak Terminus Express, Pushpak Express, Ayodhya Cantt-Lokmanya Tilak Terminus Express, Ballia-Dadar Express and Dnyaneshwari Express will be regulated at Igatpuri. The departure timings of some trains have also been revised.
Central Railway has urged passengers to check the official timetable and make alternative travel arrangements during the block period.
The block is being undertaken to facilitate the completion of the Asangaon-Kasara third line project and expansion work at the Kasara yard.
RECENT STORIES
-
MP’s Ujjain Mahamrityunjay Dwar Divider Forces 2-Km Detour, Residents Of 25 Colonies Protest Road... -
MP Class 9, 10 Half-Yearly Exams Begin Under Old Pattern As DPI Delay Leaves Students Facing Format... -
MP’s Ujjain Khade Hanuman Temple Idol Scanned Again Amid Simhastha 2028 Preparations, Fears Of... -
Bombay HC Allows Chembur Society Redevelopment, Says Members Cannot Be Made To Wait Over 15-Year-Old... -
BMC To Replace 400 Damaged Manhole Covers Across Mumbai At ₹1.10 Crore
