Mumbai: MMRDA Opens New Signal-Free Road Boosting Connectivity To BKC From Eastern Suburbs
This new route provides commuters from the Eastern Express Highway (EEH) with three alternative routes into BKC, greatly easing congestion and optimizing traffic flow.

Representational Image |
The Mumbai Metropolitan Region Development Authority (MMRDA) has opened the new signal-free road connecting the SEBI Building to Avenue-5 in BKC on Monday. This road, passing under the BKC connector and Avenue-3 (WeWork), completes a crucial 180-meter link in a record 3.5 months, half the originally planned timeline.
This development is set to significantly reduce traffic congestion at the BKC One Junction and BKC Connector Junction. The inauguration was attended by Joint MMRDA Commissioner Radhabinod Sharma and Additional Commissioner of Police (Traffic) Anil Kumbhare.
This new route provides commuters from the Eastern Express Highway (EEH) with three alternative routes into BKC, greatly easing congestion and optimizing traffic flow.
The road ensures signal-free movement, reducing travel time and enabling seamless connectivity from the eastern suburbs to BKC in just 15 minutes. Currently, three of the six lanes are open for vehicular traffic, with the remaining three to be operational soon.
This initiative is part of MMRDA's ongoing commitment to eliminating traffic jams and improving urban mobility.
Dr. Sanjay Mukherjee, Metropolitan Commissioner of MMRDA, stated, “The opening of this new link road is a significant milestone in our efforts to make BKC more accessible and commuter-friendly. This road not only provides faster connectivity from the Eastern Express Highway, but also ensures smoother traffic dispersal within BKC, enhancing its reputation as a global business hub. Completing this project in just 3.5 months underscores MMRDA’s commitment to delivering infrastructure with efficiency and excellence.”
Box: Key Features of the new road:
Signal-Free Connectivity: The 180-meter, six-lane road (with three lanes currently open) offers uninterrupted traffic flow, minimizing delays and enhancing the commuter experience.
Optimized Traffic Dispersal: By distributing traffic through three routes—BKC Connector, EEH, and internal avenues—the project reduces bottlenecks and accelerates traffic movement.
Enhanced Accessibility: The new road ensures seamless connectivity for vehicles traveling to and from the NSE side, Avenue-5, and key BKC landmarks such as the MCA Club, consulates, and MTNL.
RECENT STORIES
-
NEET UG 2026: NTA Launches Reporting Portal To Combat Fake Paper Leak Claims & Exam Frauds Ahead Of... -
Investors Gain ₹18.15 Lakh Crore In Just Two Days, Sensex Surges 2,432 Points As Crude Oil Prices... -
Bangladesh Summons Indian Diplomat After PM Advisor Zahed Ur Rahman Stopped At Delhi Airport -
Asaduddin Owaisi Signals Alliance For UP Elections 2027, Says AIMIM Ready To Join Hands To Defeat... -
FIFA WC26: France Chase 3rd Straight World Cup Final As Senegal Eye Another Shock
