Pune Villages To Experience Power Outages From April 3 To 6 - Check Out Full List
The load shedding will occur between 8 and 9pm

Pune Villages To Experience Power Outages From April 3 To 6 - Check Out Full List | Freepik
The Maharashtra State Electricity Distribution Company Limited (MSEDCL) will conduct phase-wise load shedding from Wednesday (April 3) to Saturday (April 6) in villages across Pune's Mulshi area due to the replacement of a defective power transformer. The planned activity is expected to impact over 60,000 consumers.
Reportedly, Maharashtra State Electricity Transmission Company Limited (MSETCL) will replace a defective power transformer of 50 Mega Volt Ampere (MVA) capacity at the Pirangut 220/22 Kilo Volt (KV) Extra High Voltage Substation.
The load shedding will occur between 8 and 9pm.
ALSO READ
April 3 - Villages including Rihe, Bhare, Ghotawade, Mulkhed, Khamboli, Katarkhadak, Pimpoli, Andhale, and certain industrial zones will experience outage.
April 4 - Pirangut, Paud, Darvali, Karmoli, Chale, Dakhne, Khule, Sathesai, Nandgaon, Kondhavle, Rawde, Shere, Velavade, Jamgaon, and Disli villages will be affected.
April 5 - Load shedding will occur in Bhugaon, Bhukum, Khatpe Wadi, Lavale, Chande, and Nande villages.
April 6 - Urwade, Kasaramboli, Dhotre Wadi, Ambegaon, Marnewadi, Kondhur, Kondhavale, Andhgaon, Ambervet, and Amralewadi will experience the outage.
MSEDCL and MSETCL have urged residents to cooperate during this maintenance period.
ALSO READ
RECENT STORIES
-
Kerala CEO Ratan Kelkar Says BLOs Fully Supported For Electoral Roll Revision, Denies Any Pressure... -
Delhi Air Pollution: Stricter Restrictions Imposed Amid 'Very Poor' Air Quality - DETAILS -
'Need More Such Positivity': Hindi Speaking Woman From Mumbai Praises Bengaluru Uber Driver For... -
BAZBALLED! Travis Head DESTROYS England With Record 69-Ball Ton In AUS vs ENG 1st Ashes Test; VIDEO -
PM Modi Attends G20 Leaders' Summit In Johannesburg, Receives Warm Welcome From SA President Cyril...