Thane Netizen Flags ‘Misaligned Slab’ On Metro Line 4; Alert Comes Days After Fatal Parapet Collapse In Mulund
A Thane resident flagged a suspected misaligned slab on the Ovala–Kasarvadavli stretch of Metro Line 4, prompting Thane Police to seek the exact location. The alert comes days after a parapet wall collapse in Mulund killed one and injured three. Authorities have launched a probe and arrested five persons linked to the project.

Screengrab from X
Thane: A local resident has flagged a potential safety concern along the under-construction Mumbai Metro Line 4 corridor, prompting a response from the Thane Police.
In a post on X, user Sachin Shingare shared a photograph of what he claimed was a misaligned slab on the Ovala–Kasarvadavli stretch of the Metro 4 route. Tagging the Mumbai Metropolitan Region Development Authority (MMRDA), Thane Municipal Corporation (TMC) and Thane City Police, he urged authorities to immediately inspect the site to prevent any untoward incident.
Responding to the post, Thane Police sought the exact location of the slab. The user clarified that the issue was visible between Ovala and Kasarvadavli, the first station on the Metro Line 4 corridor connecting Thane to Wadala.
Concrete Parapet Wall Falls In Mulund West
The alert has surfaced days after a tragic incident in Mulund West on February 14, when a portion of the parapet wall of an under-construction Metro Line 4 bridge collapsed onto a passing autorickshaw and car near Mulund Fire Station. An autorickshaw passenger was crushed to death, while three others sustained injuries. The injured were rushed to a private hospital, where doctors declared the auto passenger dead. One of the injured remains critical, while the others are stated to be out of danger.
The collapse triggered outrage among local residents, who gathered at the site questioning safety standards and construction practices.
ALSO READ
Mumbai Mayor Ritu Tawde, who visited the spot and later met the victim’s family, indicated possible negligence. “The parapet segment had been placed just a day earlier. If the work was recent, the stretch should have been barricaded,” she said.
The MMRDA has initiated a detailed probe into the incident, which occurred near Pier P196 of the elevated stretch. Notably, no active construction work was underway at the time of the collapse, raising serious questions about workmanship and structural integrity.
Five Accused Arrested in Connection with the Tragedy
In Mulund incident an offence is registered u/s 105, 110, 324(5), 3(5) BNS against managers, engineers, supervisor and worker of company
1. Milan Road Buildtech subcontractor of Reliance Astaldi JV
2. DB Hill LBG Supervisory company5 accused have been arrested
1. Harish Chauhan, Project Director
2. Kuldeep Sapkal, Project Manager
3. Saurab Singh, Dy Manager
4. Prashant Bhoir, Supervisor
5. Avdhoot Inamdar, Project Manager
Sr no 1 to 4 are from Milan Road Buildtech
Further investigation is underway.
To get details on exclusive and budget-friendly property deals in Mumbai & surrounding regions, do visit: https://budgetproperties.in/
RECENT STORIES
-
'Like Lord Krishna, I Have To Fight...': Vikram Bhatt On Spending More Than 2 Months In Jail -
Rajasthan PTET 2026 Registration Commences Today At ptetvmoukota2026.in; Check Important Dates & How... -
PM Modi Holds Wide-Ranging Bilateral Talks With Brazilian President Lula At Hyderabad House | VIDEO -
Sara Tendulkar Shares Pictures From Saaniya Chandhok's Wild Bachelorette Trip In Masai Mara Ahead Of... -
Jake Paul Undergoes Second Jaw Surgery After Knockout Loss To Anthony Joshua, Posts Pics With...
