Mumbai 'Pedestrian First' Drive: BMC Scraps Footpath Parking And Temporary Structure Exemptions, Begins Encroachment Crackdown
The BMC has tightened its Universal Footpath Policy 2023 under the ‘Pedestrian First’ campaign by removing exemptions for temporary structures and footpath parking. The first phase will target 37.7 km of footpaths in K-West ward, while societies, shops, and commercial establishments have been given one month to remove unauthorised ramps and other obstructions.

BMC has begun a stricter footpath clearance drive across Mumbai, targeting parking, hawkers, ramps, and other obstructions under its ‘Pedestrian First’ campaign | AI Generated Image
Mumbai, August 8, 2026: Signalling a zero-tolerance crackdown to reclaim Mumbai’s footpaths for pedestrians, the BMC has tightened its Universal Footpath Policy 2023 under the ‘Pedestrian First’ campaign, scrapping exemptions that allowed temporary structures and vehicle parking on pavements.
The guidelines also mandate removal of all encroachments through due process and provide for the relocation or redesign of authorised vendor stalls, wherever legally feasible, to restore clear, obstruction-free walking space.
The crackdown will prioritise footpaths linking railway and Metro stations, schools and colleges, hospitals, BMC and government offices, religious places, and other high-footfall locations.
The BMC has also identified hawkers, vending stalls, utility feeder boxes, and vehicle parking as common but undesirable features that can render footpaths inaccessible.
Exemptions Under 2023 Policy Scrapped
The revised rules close loopholes in the 2023 policy that permitted temporary parking for up to 15 days in isolated and rare cases, subject to written justification, Additional Municipal Commissioner approval, and a 1.2-metre pedestrian passage. These exemptions have now been scrapped.
Likewise, the earlier provision allowing temporary structures with approval from senior civic officials, along with the mandatory 1.5-metre pedestrian passage, has been dropped.
Licence and encroachment officials will be held responsible for clearing unauthorised structures and hawkers, stopping shops from spilling goods onto footpaths, and removing illegal banners, hoardings, and advertisements.
K-West Ward Action Begins
As part of its ‘Pedestrian First’ campaign, the BMC’s K-West ward will reclaim around 320 km of footpaths in the first phase, with 27 of 355 roads identified for action and 37.7 km of pedestrian pathways targeted for encroachment removal.
Also Watch:
ALSO READ
The civic body has given housing societies, commercial establishments, and shop owners one month to remove unauthorised ramps, platforms, and other obstructions at their own cost, failing which they will face demolition and strict action.
To get details on exclusive and budget-friendly property deals in Mumbai & surrounding regions, do visit: https://budgetproperties.in/
RECENT STORIES
-
Planning Monsoon Trek With Your Kids? Try These 5 Scenic Spots Near Mumbai -
Vanrang 2026 Brings Maharashtra’s Tribal Heritage To Mumbai, Showcases Art, Culture And... -
India Bars Solar, Wind And Hybrid Renewable Energy Projects Within 1 Km Of International Borders... -
Madanpura’s Lost Loom Legacy Revived: How Mumbai’s Textile Hub Faded Into History -
India Kidney Transplant Crisis: Over 200 Patients Died Awaiting Transplants In 2025, Delhi Reported...
