Bhopal: 100 MCFT Water Released From Upper Lake
BMC assistant engineer Ajay Solanki said, “At 10.20 am, gate no 5 was opened and it was closed at 6 pm.
Staff Reporter
Updated: Tuesday, September 26, 2023, 01:11 AM IST

Bhopal (Madhya Pradesh): About 100 million cubic feet (MCFT) of water was released from Upper Lake with opening of Bhadbhada dam gate no 5 on Monday. Upper Lake’s Full Tank Level (FTL) is 1,666.8 feet.
BMC assistant engineer Ajay Solanki said, “At 10.20 am, gate no 5 was opened and it was closed at 6 pm. 100 MCFT water was released from Upper Lake.” Earlier, two gates of Bhadbhada dam were opened after water level increased to 8 feet in Kolans River following heavy rainfall in Sehore district. It led to rise in Upper Lake’s water level.
ALSO READ
MP Election 2023: Ex-CM Digvijaya Singh Jibes At PM Modi's Visit To Bhopal, Says BJP Is Scared
RECENT STORIES
-
Medical Emergency Mid-Air! Bengaluru-Indore IndiGo Flight Diverted To Hyderabad, Lands 86 Minutes... -
Single Lab Report Not Enough! Supreme Court Quashes Drug Firm's Blacklisting In Madhya Pradesh -
Thane Integral Ring Metro: PIL In Bombay HC Challenges Tree-Felling Permissions, Seeks Constitution... -
Mumbai: Father Alleges Medical Negligence After 13-Year-Old Girl Dies At HBT Trauma Hospital In... -
Maharashtra: Education Scheme Boosts Girls’ Law Admissions By 1,240, Enrolment Share Reaches 43.38...
