Bhopal: 100 MCFT Water Released From Upper Lake
BMC assistant engineer Ajay Solanki said, “At 10.20 am, gate no 5 was opened and it was closed at 6 pm.
Staff Reporter
Updated: Tuesday, September 26, 2023, 01:11 AM IST

Bhopal (Madhya Pradesh): About 100 million cubic feet (MCFT) of water was released from Upper Lake with opening of Bhadbhada dam gate no 5 on Monday. Upper Lake’s Full Tank Level (FTL) is 1,666.8 feet.
BMC assistant engineer Ajay Solanki said, “At 10.20 am, gate no 5 was opened and it was closed at 6 pm. 100 MCFT water was released from Upper Lake.” Earlier, two gates of Bhadbhada dam were opened after water level increased to 8 feet in Kolans River following heavy rainfall in Sehore district. It led to rise in Upper Lake’s water level.
ALSO READ
MP Election 2023: Ex-CM Digvijaya Singh Jibes At PM Modi's Visit To Bhopal, Says BJP Is Scared
RECENT STORIES
-
Bihar Assembly Elections 2025: Congress MLA Murari Gautam Quits Party Ahead Of Poll, Likely To... -
Mumbai Greets UK PM Keir Starmer With Billboards & Warmth On Maiden India Visit - VIDEO -
VIDEO: PM Modi Inaugurates Navi Mumbai International Airport, Unveils Major Landmark In India’s... -
Delhi Horror: Woman Pours Boiling Oil & Chilli Powder On Sleeping Husband In Madangir -
Video: Shubman Gill, Jasprit Bumrah & Other Team India Players Arrive At Gautam Gambhir's Residence...