Bhopal: 100 MCFT Water Released From Upper Lake
BMC assistant engineer Ajay Solanki said, “At 10.20 am, gate no 5 was opened and it was closed at 6 pm.
Staff Reporter
Updated: Tuesday, September 26, 2023, 01:11 AM IST

Bhopal (Madhya Pradesh): About 100 million cubic feet (MCFT) of water was released from Upper Lake with opening of Bhadbhada dam gate no 5 on Monday. Upper Lake’s Full Tank Level (FTL) is 1,666.8 feet.
BMC assistant engineer Ajay Solanki said, “At 10.20 am, gate no 5 was opened and it was closed at 6 pm. 100 MCFT water was released from Upper Lake.” Earlier, two gates of Bhadbhada dam were opened after water level increased to 8 feet in Kolans River following heavy rainfall in Sehore district. It led to rise in Upper Lake’s water level.
ALSO READ
MP Election 2023: Ex-CM Digvijaya Singh Jibes At PM Modi's Visit To Bhopal, Says BJP Is Scared
RECENT STORIES
-
Andheri East Traffic Chaos: Mumbai Police Bikes Block Road At Bisleri Signal, Raise Serious... -
SRH vs KKR, IPL 2026, Match 45: Pat Cummins Won Toss & Elected To Bat First In Hyderabad -
Eknath Shinde's Son & MP Shrikant Shinde Tries Mumbai's Vada Pav At This Indian Restaurant In US |... -
Commuter Charged ₹500 Fine For Stopping On Mumbai–Pune Missing Link's Cable-Stayed Bridge |... -
IPL 2026: Mittal Family & Adar Poonawalla Set To Acquire Rajasthan Royals In Whopping ₹15,660...
