Mumbai: Metro 2A & 7 Ridership Speeds Past 10-Cr Mark
The 18.6-km-long Line 2A extends from Dahisar to D N Nagar, with 17 stations in between.

Mumbai News: Metro 2A, 7 Ridership Speeds Past 10-Cr Mark | FPJ
In a significant milestone, the cumulative ridership of Metro Lines 2A and 7 have sped past the 100-million mark. Informing about the achievement on social media platform X, Metropolitan Commissioner Dr Sanjay Mukherjee said, Proud day for Mumbai Metropolitan
Region Development Authority (MMRDA) as the total ridership of Metro lines 2A and 7 reaches 100 million. A million thanks to Mumbaikars for choosing Metro as the preferred mode of travel. My congratulations to the team. The complete operations of Lines 2A and 7 started from January, 2023, while the phase 1 of both the corridors was inaugurated on April 2, 2022.
The 18.6-km-long Line 2A extends from Dahisar to D N Nagar, with 17 stations in between. It also provides interconnectivity with Line 1 (Ghatkopar to Versova), Lines 2B (D N Nagar to Mandale) and 7 (Andheri East to Dahisar East), and Line 6 (Swami Samarth Nagar to Vikhroli).
Similarly, the 16.5-km-long Line 7 seamlessly connects Dahisar with Andheri East. Besides providing linkages to Lines 1, 2A and 6, the corridor has proved to be of great help in decongesting the Western Express Highway.
Published on: Thursday, May 30, 2024, 11:23 AM ISTRECENT STORIES
-
Mumbai Rains Trigger Track Cave-In On Trans Harbour Line; Local Train Services Delayed, Operations... -
'I Couldn't Care Less About...': Cristiano Ronaldo Fires Back At 'Lionel Messi' Questions After... -
Sensex Jumps 588 Points, Nifty Climbs 0.5% As Crude Oil Eases, IT Stocks Lead Gainsw -
ICAI CA Intermediate May Result 2026 OUT Now; Direct Link Here -
Lionel Messi Turns 39: AFA Honours Argentina Captain's Historic Legacy Amid FIFA World Cup 2026...
