Attention Commuters! Three-Day Traffic Block On Mumbai-Pune Expressway For Bridge Construction From Jan 22-24; Check Details
During this period, traffic heading from Mumbai to Pune will be diverted from Kilometer 54/700 at Walvan to the Varsoli Toll Plaza via the Dehu Road route (National Highway No. 48).

Video Screengrab
Commuters traveling on the Mumbai-Pune Expressway are advised to plan their journeys carefully as a three-day traffic block has been scheduled for construction work. The Maharashtra State Road Development Corporation (MSRDC) will be installing girders for a new bridge at Kilometer 58/500 (Dongargaon/Kusgaon) on the Mumbai-bound carriageway.
The traffic block will be in effect from January 22 to January 24, 2025, between 12 PM and 3 PM each day. During this period, traffic heading from Mumbai to Pune will be diverted from Kilometer 54/700 at Walvan to the Varsoli Toll Plaza via the Dehu Road route (National Highway No. 48).
Similarly, traffic traveling from Pune to Mumbai will continue to use the expressway without any changes. After 3:00 PM each day, traffic on the Mumbai-Pune carriageway will resume as usual.
Commuters are urged to plan their travel accordingly to avoid delays. Drivers facing any difficulties during the traffic block can contact the Expressway Control Room at 9822498224 or the Highway Police Department at 9833498334 for assistance.
Authorities appreciate the public’s cooperation and patience as these essential infrastructure improvements are carried out.
RECENT STORIES
-
AIBE 21 Exam 2026 Tomorrow: Here’s Everything Candidates Must Know Before Appearing In The Exam -
T20 Mumbai League 2026: Shivam Dube's Bowling Brilliance, Divyaansh Sksena's Unbeaten 88 Propel ARCS... -
Rashmika Mandanna's Boss Lady Era For Cocktail 2 Continues With Another Stunning Blazer Look -
Madhya Pradesh June 6, 2026, Weather Updates: Pre-Monsoon Activity Intensifies In State; Orange... -
MH CET Law 2026 Final Answer Key Released At cetcell.mahacet.org; Only One Objection Approved
