foot-over-bridge

Mumbai: Western Railway build 9 new FOBs, one new skywalk during lockdown

Mumbai: Western Railway build 9 new FOBs, one new skywalk during lockdown

Using the suspension of regular train services to their advantage, Western Railway (WR) has constructed nine new foot-over-bridges (FOB),...Read More

Mumbai: Western Railway opens new 10-metre-wide FOB at Grant Road station

Mumbai: Western Railway opens new 10-metre-wide FOB at Grant Road station

While continuing its efforts to provide a safe and comfortable travelling experience to the commuters, Western Railway on Wednesday opene...Read More

Mumbai: Western Railway opens new elevator and foot over bridge at Palghar station

Mumbai: Western Railway opens new elevator and foot over bridge at Palghar station

To provide better amenities and facilities to its passengers, the Western Railway on Tuesday opened new elevator and foot over bridge (FO...Read More

Mumbai: Foot over bridge at Parel Station to remain shut for one month

Mumbai: Foot over bridge at Parel Station to remain shut for one month

Daily commuters using Foot over Bridge (FoB) at Parel Station are going to face several issues to reach the station given the FoB will sh...Read More

Mumbai: MMRDA proposes nine FOBs on Metro line 7

Mumbai: MMRDA proposes nine FOBs on Metro line 7

Mumbai: The Mumbai Metropolitan Region Development Authority (MMRDA) has identified nine stations on Metro line 7 (Andheri East to Dahisa...Read More

Mumbai: Height barrier of FOB at King’s Circle collapses

Mumbai: Height barrier of FOB at King’s Circle collapses

Mumbai: A major accident was averted when a height barrier of foot over-bridge (FOB) near King’s Circle railway bridge was dislocated whe...Read More

Mumbai: Reconstruction of Marine Lines foot over bridge to cost Rs.5.60 cr; 18-month timeline

Mumbai: Reconstruction of Marine Lines foot over bridge to cost Rs.5.60 cr; 18-month timeline

The BMC has awarded Rs 4.35 crore contract for the reconstruction of two foot overbridges outside the Marine Lines railway station, which...Read More

Mumbai: Western Railway to shut Dadar FOB from today

Mumbai: Western Railway to shut Dadar FOB from today

MUMBAI: The Western Railway is all set to shut Dadar Station’s foot-over bridge going towards Churchgate from May 14. This comes after th...Read More

Mumbai: Mega block between Diva and Kalyan on May 3, 4

Mumbai: Mega block between Diva and Kalyan on May 3, 4

Mumbai: Central Railway will operate night traffic and power Block on Up and Dn slow line between Diva and Kalyan for launching of 4 Gird...Read More

Mumbai: BMC, railways spar over CSMT FOB collapse

Mumbai: BMC, railways spar over CSMT FOB collapse

Mumbai: Over a month after a foot over bridge (FOB) near the Chhatrapati Shivaji Maharaj Terminus (CSMT) collapsed, killing seven persons...Read More

CSMT bridge collapse: Two BMC engineers file bail pleas, claiming the case against them is “false and concocted”

CSMT bridge collapse: Two BMC engineers file bail pleas, claiming the case against them is “false and concocted”

Mumbai: Two BMC engineers, arrested in connection with last month’s foot-over bridge (FOB) collapse here, have moved separate bail pleas ...Read More

CSMT bridge collapse: Structural audit valid only for six months, accused tells court

CSMT bridge collapse: Structural audit valid only for six months, accused tells court

Mumbai: A structural audit is valid only for six months and the foot-over-bridge (FOB) outside the CSMT station here collapsed two years ...Read More

Mumbai: Arrest of BMC engineers condemned

Mumbai: Arrest of BMC engineers condemned

Mumbai: A union of engineers of the Brihanmumbai Municipal Corporation (BMC) on Thursday condemned the arrest of two civic engineers in c...Read More

Mumbai CMST bridge collapse: 32-year-old man pushes father to safety, gets crushed to death under cement slab

Mumbai CMST bridge collapse: 32-year-old man pushes father to safety, gets crushed to death under cement slab

Six people were killed and 31 were injured when a portion of a busy foot over bridge near iconic CSMT railway station collapsed on Thursd...Read More

Mumbai CSMT foot overbridge collapses: 6 dead, 33 injured; audit was carried out recently

Mumbai CSMT foot overbridge collapses: 6 dead, 33 injured; audit was carried out recently

Mumbai: Two concrete slabs of the 35-year-old foot over-bridge outside the Chhatrapati Shivaji Maharaj Terminus railway station caved in ...Read More

Four more escalators for Bhayandar railway station on anvil

Four more escalators for Bhayandar railway station on anvil

Bhayandar: As a part of their comprehensive plan for further improvement and upgradation, the Railways has approved four more escalators ...Read More

Mumbai: BJP MP threatens his own govt over stalled Malad Foot Over Bridge

Mumbai: BJP MP threatens his own govt over stalled Malad Foot Over Bridge

Mumbai: Up till now it was the Shiv Sena that was criticising it’s own government, now it is turn of the Bharatiya Janata Party (BJP) to ...Read More

Mumbai: FOB near Vashi creek bridge caves-in

Mumbai: FOB near Vashi creek bridge caves-in

Mumbai: A foot-over-bridge (FOB) near Vashi Creek bridge collapsed on Sunday afternoon, affecting traffic movement on the busy Sion-Panve...Read More

Mumbai: Matunga station foot over-bridge closed for public after cracks found

Mumbai: Matunga station foot over-bridge closed for public after cracks found

Mumbai: A foot over-bridge (FOB) connected to the Matunga railway station on the Central Railway has been shut for public after cracks we...Read More

Mumbai: A day after Andheri bridge collapsed, FOB connecting Elphinstone-Parel stations becomes operational

Mumbai: A day after Andheri bridge collapsed, FOB connecting Elphinstone-Parel stations becomes operational

Mumbai, Suburban train commuters at the Elphinstone Road-Parel stations here got a big relief as the Western Railway today threw open a 7...Read More

Free Press Journal

www.freepressjournal.in