Sweety Adimulam

@AdimulamSweety
Sweety Adimulam is a journalist with over seven years of reporting experience. She writes for The Free Press Journal on infrastructure, housing and human interest stories. She has previously also reported on court cases, city crime and politics. She began her career as a television journalist.

Stories By Sweety Adimulam

MHADA will appoint consultant to revamp transit camps in State

MHADA will appoint consultant to revamp transit camps in State

The MBRRB (Mumbai Building Repairs and Redevelopment Board), an undertaking of MHADA (Maharashtra housing and area Development Authority)...Read More

BMC yet to clear hotel bills for services availed during lockdown: H&RA

BMC yet to clear hotel bills for services availed during lockdown: H&RA

BMC Commissioner Iqbal Singh Chahal remained unavailable for any comment on the issue.

Mumbai properties' stamp duty registration garner ₹300cr in Oct

Mumbai properties' stamp duty registration garner ₹300cr in Oct

Surprisingly, the state exchequer collection did not witness any decline despite the Mahavikas Aghadi government slashed stamp duty from ...Read More

Mumbai Metro One sees steady uptick in ridership

Mumbai Metro One sees steady uptick in ridership

1.25 lakh people have travelled in the last one week

Twin tunnels’ work near Kasara Ghat gains pace

Twin tunnels’ work near Kasara Ghat gains pace

Uneven rainfall during this monsoon and pandemic induced lockdowns delay works

Solar-fueled machine to filter Mithi River’s water

Solar-fueled machine to filter Mithi River’s water

Once it is operational, a mobile application will be made available, which will allow people to turn in plastic and equivalent units of w...Read More

Regulate vehicular traffic inside Aarey, demands activist

Regulate vehicular traffic inside Aarey, demands activist

Earlier this month the Mahavikas Aghadi government declared 808 acres of Aarey as reserve forest, apart from shifting the controversial M...Read More

Mumbai-Pune Expressway missing link project deadline extended

Mumbai-Pune Expressway missing link project deadline extended

The revised project completion deadline is now September 2022 as against February 2022 earlier

Water taxi from Ferry Wharf to Mandwa not before Nov 15: MbPT

Water taxi from Ferry Wharf to Mandwa not before Nov 15: MbPT

Currently, the travel time between the Gateway of India and Mandwa by catamaran is around one hour. The water taxis are expected to comp...Read More

Ropeway project connecting Gorai 
Village to Metro 2A gets held up

Ropeway project connecting Gorai Village to Metro 2A gets held up

The wait for the ropeway connectivity to Metro 2A (Dahisar--DN Nagar) may be much longer than expected, as the Mumbai Metropolitan Region...Read More

Mumbai Metro Resumption: First day records footfall of more than 12,000 passengers

Mumbai Metro Resumption: First day records footfall of more than 12,000 passengers

Response has been low; MMOPL tells passengers its service is open for all

MMRDA looking for an agency to supply & install signage boards on Metro Line 2A & 7 stations

MMRDA looking for an agency to supply & install signage boards on Metro Line 2A & 7 stations

The Mumbai Metropolitan Region Development Authority (MMRDA) is looking for agencies for supply and installation of signage boards on Met...Read More

Ramchandra Hejeps chawl: Residents who vacated homes in 2009 for redevelopment still await new houses

Ramchandra Hejeps chawl: Residents who vacated homes in 2009 for redevelopment still await new houses

All these residents want MLA Aditya Thackeray to intervene and help them in resolving the issue.

Mumbai: Distressed fishermen dissatisfied over Maharashtra relief package

Mumbai: Distressed fishermen dissatisfied over Maharashtra relief package

The state turned a blind eye towards 90,000 labourers working on 20,000 boats: Fishermen's Association

Mumbai Metro One to run from Monday; trips will be at a gap of 6 minutes during peak hours

Mumbai Metro One to run from Monday; trips will be at a gap of 6 minutes during peak hours

The Reliance Infrastructure-led Mumbai Metro One Private Limited (MMOPL) that runs between Ghatkopar and Versova will commence operation ...Read More

MMRDA extends timeline for bidders of monorail rakes

MMRDA extends timeline for bidders of monorail rakes

Bidders interested to manufacture and supply new monorail rakes can participate up to December 8.The Mumbai Monorail an undertaking of th...Read More

Builders Association of India expresses desire to redevelop cess buildings and stuck SRA projects

Builders Association of India expresses desire to redevelop cess buildings and stuck SRA projects

The Builders Association of India (BAI), an apex body of the construction sector with more than 20,000 members, has written a letter to M...Read More

MBRRB warns real estate developers for not kicking off redevelopment work

MBRRB warns real estate developers for not kicking off redevelopment work

The Mumbai Building Repairs and Redevelopment Board (MBRRB) has started issuing warning notices to developers who have not started redeve...Read More

Mumbai Metro

Mumbai: Fresh air for company

Mumbai Metro One, which runs between Ghatkopar and Versova, will resume operations in a graded manner from October 19, from 8.30am to 8.3...Read More

LIC properties in SoBo need urgent redevelopment: MP Arvind Sawant

LIC properties in SoBo need urgent redevelopment: MP Arvind Sawant

The Member of Parliament (MP) Arvind Sawant on Wednesday said that the Life Insurance Corporation of India's ownership of 92 properties (...Read More

Free Press Journal

www.freepressjournal.in